top of page
KPVillas.org

BLOG
Independent opinions and observations
Search


New ACC Chair
"Welcome, Paul M, to our KPVA team," writes President Sandy S. in a January 4 email to all homeowners. "Paul joined our team as the new Architectural Control Committee (ACC) Chairman in November 2025. Some of us are gearing up for Spring projects that will need to be approved. As a gentle reminder, the paperwork that needs to be filled out and submitted for approvals is located on our website at knollwoodparkvillas.org ." Click to open Exterior Modification Request. In att
Jan 41 min read


New Gas Modules in 2026
NIPSCO will begin installing new gas modules in January 2026 as they transition to Advanced Metering Infrastructure (AMI). Per the utility, "There will be no interruption of gas service. " Technicians from InfraSource (a subsidiary of the subcontractor Quanta Utility Engineering Services) "will carry photo identification, wear uniforms, and drive marked vehicles. The installation process will be done at not charge and will typically take less than 15 minutes." Marked tru
Dec 15, 20252 min read


Road Cracks Sealed
Over two days in early November, a five-man crew sealed road cracks to prevent the freeze/thaw cycle from creating potholes. As one worker blew out the cracks ahead of the truck, another applied the heated sealant. The contractor Asphalt Restoration Services describes it as "an asphalt-based emulsion sealer that reduces negative impact on the environment instead of the commonly used, highly carcinogenic coal tar alternative." Asphalt Restoration Services (ARS) workers bl
Nov 6, 20252 min read


Use Adams Exit During Road Sealing
When Asphalt Street Restorations seals road cracks in the last week of October, 2025, homeowners and their visitors will need to exit and enter KPVillas through the back gate on Adams Road for part or most of that day. Homeowners will need to enter and exit KPVillas at the Adams Rd. gate when road cracks are being sealed in late October 2025. KPVA President Sandy S writes in an October 16 email, "This project is expected to take 2-3 days to complete. ARS said that we will rec
Oct 16, 20251 min read
Blog: Blog2
Blog Tags
Disclaimer
Disclaimer:
KPVillas.org is an independent website that does not represent the opinions or initiative of any HOA or Board. An official HOA site is at KnollwoodParkVillas.org.
bottom of page