New H-Frame Built
- Chuck Bueter
- Jun 13
- 1 min read
An H-frame, meter box, and breaker panel were installed June 7, 2025, at the new well on the Huntington Lane island.

KPVA Vice President Sandra S. notes, "I&M needs to first pull a permit, then hire the contractors to do the ditch witch dig and run conduit. Then I&M can run the wire to the H-frame...I&M draws up the design and the easements, then generates the final cost and invoices us for the work. "
St. Joseph County has to inspect the H-frame before the connection work can begin. The electrician who built the H-frame will hook up the pump to the meter and breaker panel.
Thanks go to Sandy for dealing with permits, contractors, scheduling, and oversight on the project to irrigate the Huntington Lane island with new water wells.